I-80 in California

Discussion in 'Truckers' Weather & Road Conditions' started by HotH2o, Sep 20, 2014.

  1. HotH2o

    HotH2o Road Train Member

    4,094
    4,863
    Sep 23, 2012
    Bunyan Springs, Colorado
    0
    Caltrans will begin work to raise the vertical clearance of nine structures in Placer County that cross Interstate 80. The overcrossings include eight vehicle bridges and one railroad trestle from the Brace Road overcrossing in Loomis to the Magra Road overcrossing east of Colfax.

    The vertical clearance of these structures is being raised to 16-feet 6-inches to meet current standards that improve access on I-80 through the Sierra for interstate commerce and national security. Six structures will be raised using a complex system of jacks and reconstruction, while the roadway under the remaining three structures will be dug down to create the required clearance.

    Work will begin in September of 2014 and go through the fall of 2015. Each of the six raised structures will require I-80 to be completely closed overnight for two nights, and the overcrossings will be closed for up to 22 days. Structures requiring the highway to be dug lower will require multiple long-term lane and ramp closures. Traffic detours will be in effect during the construction work in the communities of Loomis, Penryn, Newcastle, Weimar and Colfax.

    For more info go to raise80.com

    Interstate 80 at Magra will be closed on September 23 and September 24 from 10:30PM – 5AM. A 56-mile detour will be in effect.
     
    albert l Thanks this.
  2. Truckers Report Jobs

    Trucking Jobs in 30 seconds

    Every month 400 people find a job with the help of TruckersReport.