Talk to your coordinator or contractor relations - packages have probably gone out already. There are always add on loads to pick up as extras.
I can't run them due to my fifth wheel, not enough clearance to my headache rack. I wonder how some of those loads will work out with ELD's since most of the routes I saw in the northeast pushed the limits of what might possibly be done legally if there was no traffic at all. How can you plan like that to run from PA up to new england and back calculated at the speed limit no less?
mercer transportation
Discussion in 'Mercer' started by kw12, Jul 21, 2012.
Page 3164 of 3685
-
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
-
-
As of friday they hadnt started offering packages yet.
-
Rickp Thanks this.
-
back street slider Thanks this.
-
Highway Sailor Thanks this.
-
-
-
drvrtech77 and thaistick Thank this.
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
Page 3164 of 3685