I-40 AR/TN bridge closed until further notice

Discussion in 'Truckers' Weather & Road Conditions' started by Linte_Loco, May 12, 2021.

  1. Linte_Loco

    Linte_Loco Road Train Member

    1,618
    6,484
    Apr 24, 2011
    LA (lower Alabama)
    0
    bzinger and JonJon78 Thank this.
  2. Truckers Report Jobs

    Trucking Jobs in 30 seconds

    Every month 400 people find a job with the help of TruckersReport.

  3. fishonron

    fishonron Medium Load Member

    647
    1,652
    Jul 25, 2017
    North Central Kansas
    0
    That's a little more than a crack I'd say.
    That's a big deal...
     
    Last edited: May 12, 2021
  4. Opus

    Opus Road Train Member

    16,285
    91,261
    Dec 18, 2011
    South GA
    0
    Made it over just in time, I guess.
    55 is so suckey on a normal day, it will be impossible until 40 opens back up.
    Oh well. Life of a trucker
     
    JoeyJunk and Linte_Loco Thank this.
  5. Dna Mach

    Dna Mach Road Train Member

    3,210
    2,831
    Aug 8, 2008
    Texas
    0
    Just read an article that this was a routine check that they do every two years. Crack was so bad that the inspection crew called 911 and they had i-40 closed within about ten minutes. Sounds like a catastrophic event was narrowly missed. They’ve shut down barge traffic on the Mississippi as well.
     
    bzinger, mjd4277 and Linte_Loco Thank this.
  6. buzzarddriver

    buzzarddriver Road Train Member

    3,229
    8,699
    Feb 1, 2011
    Dallas, TX
    0
    Duct Tape. That will fix it.
     
    Linte_Loco Thanks this.
  7. fishonron

    fishonron Medium Load Member

    647
    1,652
    Jul 25, 2017
    North Central Kansas
    0
    Linte_Loco Thanks this.
  8. Hammer166

    Hammer166 Crusty Information Officer

    6,945
    23,875
    Aug 18, 2007
    ~8600+' and loving it!
    0
    That's not carrying the traffic load. Most all of the vertical load is handled by the arch and suspension cables and directed into the piers. That beam is there to stabilize those huge crossbeams, and probably takes some good loads as traffic accelerates or decelerate. If you've ever been on a bridge in stop and go traffic, that fore and aft shaking (especially from heavy trucks taking off from a stop) would generate separation and twisting forces between those crossbeams that'd load that member. I bet that beam takes some hellacious wind loading, too.
     
  9. Linte_Loco

    Linte_Loco Road Train Member

    1,618
    6,484
    Apr 24, 2011
    LA (lower Alabama)
    0
    I never really noticed what the bridge looks like from side. But this may put it in perspective

    [​IMG]
     