Pedestrian Bridge Collapse Miami Florida Int'l University

Discussion in 'Other News' started by STexan, Mar 15, 2018.

  1. STexan

    STexan Road Train Member

    14,962
    29,144
    Oct 3, 2011
    Longview, TX
    0
    New reports state the construction team was conducting "stress tests" at the time of the collapse. SMH
     
    buddyd157 Thanks this.
  2. Truckers Report Jobs

    Trucking Jobs in 30 seconds

    Every month 400 people find a job with the help of TruckersReport.

  3. O.Henry

    O.Henry Road Train Member

    1,038
    1,820
    Sep 1, 2012
    San Antonio,TX.
    0
  4. STexan

    STexan Road Train Member

    14,962
    29,144
    Oct 3, 2011
    Longview, TX
    0
    There will be street cam video detailing exactly what happened but we'll never see it.
     
  5. MACK E-6

    MACK E-6 Moderator Staff Member

    46,049
    201,715
    Sep 19, 2005
    Baltimore, MD
    0
    The slip-and fall lawyers are all salivating over this.
     
    buddyd157 and mjd4277 Thank this.
  6. STexan

    STexan Road Train Member

    14,962
    29,144
    Oct 3, 2011
    Longview, TX
    0
    And this is one of those cases where they should be. Likely lots of direct and indirect blame to go around on this one
     
    MACK E-6 Thanks this.
  7. not4hire

    not4hire Road Train Member

    7,142
    26,948
    May 16, 2012
    Calgary
    0
    The bridge was nowhere near being finished. It wasn't set to open until next year and there was much work to be done, including the construction of the primary supporting column from which cables were to be suspended.

    The construction process ABC (Accelerated Bridge Construction) is well-proven in general and has been in use for many years. There were some unusual aspects to this particular project though, such as placing the span before the primary supporting structure. This isn't a problem so long as the temporary support/shoring is adequate.

    At this point it is too early to tell if it is the design, materials, construction, or something else that led to the failure.
     
  8. STexan

    STexan Road Train Member

    14,962
    29,144
    Oct 3, 2011
    Longview, TX
    0
    Probably a combination there of.

    I just don't see how you can be tweaking with key support members and components of a brand new and untested bridge span [that's still missing it's most critical support component], with such heavy and powerful machinery, and allow people to be underneath.
     
    Last edited: Mar 17, 2018
    Rocks Thanks this.
  9. buddyd157

    buddyd157 Road Train Member

    13,454
    34,351
    May 25, 2017
    under a shade tree
    0
    been all over thr talk radio, and tv news..."why was traffic allowed to continue as this was being "tested" or still being put into place"?

    it was not a FL-DOT project, but rather a private one, from what is being said.
     