Advice - how to charge for 7 axle dump?

Discussion in 'Tanker, Bulk and Dump Trucking Forum' started by AfroLatino90, Dec 9, 2017.

  1. AfroLatino90

    AfroLatino90 Bobtail Member

    Joined:
    Dec 9, 2017
    Messages:
    12
    Thanks Received:
    2
    0
    I am trying to learn as much as possible about the dump truck market. I am looking to purchase a 7 Axle Superdump truck. My question is how should I go about charging for my services. Should I charge by the load Or charge an hourly rate? I’d much rather charge by the load but I need some advise. Please and thank you.
     
  2. Bakerman

    Bakerman Road Train Member

    Joined:
    Jan 27, 2013
    Messages:
    4,663
    Thanks Received:
    8,812
    Location:
    Phoenix, AZ
    0
    Guys here in the Phoenix area get paid by the ton.
     
    AfroLatino90 Thanks this.
  3. NightWind

    NightWind Road Train Member

    Joined:
    Nov 11, 2006
    Messages:
    2,685
    Thanks Received:
    18,927
    Location:
    Sunny South, AL
    0
    Almost ALL dumps charge by the ton, but keep in mind you have to figure in time and mileage as well to come up with the correct rate.

    There are some jobs like asphalt where it's by the hour
     
    AfroLatino90 Thanks this.
  4. shogun

    shogun Road Train Member

    Joined:
    Jan 23, 2009
    Messages:
    6,075
    Thanks Received:
    72,159
    Location:
    Doing a regen
    0
    The question you should be asking yourself is “is there steady work available and how long will it be unloading and loading?” Something like a 7 axle I would think would need to charge by the hour to be profitable, and it would probably need to be north of $100 hr with a time minimum to be worth it.
     
    NavigatorWife Thanks this.
  5. x1Heavy

    x1Heavy Road Train Member

    Joined:
    Mar 5, 2016
    Messages:
    34,017
    Thanks Received:
    42,135
    Location:
    White County, Arkansas
    0
    My old boss charged by the ton, and trip. It is generally enough to cover the materials, payroll and cost of driving a certain distance with that load.

    If you are not charging enough per ton, you will eventually accumulate a debt to the shipper of your material. You do not want that.
     
    AfroLatino90 Thanks this.
  6. Just Trucking 101

    Just Trucking 101 Bobtail Member

    Joined:
    Dec 7, 2017
    Messages:
    12
    Thanks Received:
    5
    0

    I agree!
     
  7. joehi2470

    joehi2470 Bobtail Member

    Joined:
    Nov 11, 2017
    Messages:
    15
    Thanks Received:
    17
    0
    In Oregon when I drove a Dump truck it was all by the hour.
     
  8. AfroLatino90

    AfroLatino90 Bobtail Member

    Joined:
    Dec 9, 2017
    Messages:
    12
    Thanks Received:
    2
    0
    Thank you for the feed back I really do appreciate it!
     
    x1Heavy Thanks this.
  9. AfroLatino90

    AfroLatino90 Bobtail Member

    Joined:
    Dec 9, 2017
    Messages:
    12
    Thanks Received:
    2
    0
    Ok nice! Thank you for the feedback
     
  10. AfroLatino90

    AfroLatino90 Bobtail Member

    Joined:
    Dec 9, 2017
    Messages:
    12
    Thanks Received:
    2
    0
    Thank you for the feed back! Im in Dallas Texas and construction out here never seems to end. There is a new highway being built all the time, not to mention the other countless construction jobs going on. There is plenty of work here in Dallas.