LNG: How long does it usually take to load a trailer?

Discussion in 'Tanker, Bulk and Dump Trucking Forum' started by ncdriver1, Mar 2, 2024.

  1. ncdriver1

    ncdriver1 Road Train Member

    1,106
    1,252
    Dec 3, 2012
    0
    Might be doing some new work that involves LNG, trailers are multi-canister type 3 or 4's? (not sure exactly) and are pressurized at 3000-4000psi. These would be live loaded, soooooooo how long does it usually take?
     
    KDHCryo and viper822004 Thank this.
  2. Truckers Report Jobs

    Trucking Jobs in 30 seconds

    Every month 400 people find a job with the help of TruckersReport.

  3. KDHCryo

    KDHCryo Medium Load Member

    396
    501
    Sep 14, 2023
    0
    Let me check with my boy who is doing this for KAG right now up in the northeast, but usually LNG and CNG trailers are drop and hook, and the driver has to do nothing
     
    ncdriver1 Thanks this.
  4. ncdriver1

    ncdriver1 Road Train Member

    1,106
    1,252
    Dec 3, 2012
    0
    Thats what I thought too, but the trainings show the driver doing everything. Technically the unload is drop and hook but you are still connecting it to the boiler and such. Looks way more than usual tanker work lol
     
  5. Cali kid

    Cali kid Road Train Member

    1,731
    2,361
    Feb 15, 2011
    IE, CA
    0
    You must mean CNG not LNG ain’t no way the liquid is under 3000-4000psi.
     
    viper822004 Thanks this.
  6. Cat sdp

    Cat sdp . .

    20,867
    72,119
    Apr 8, 2012
    Orion's Belt
    0
    Depends on the pressure in the pipeline……..

    the place near me preloads them and then driver takes them to customers.Then the driver makes all connections between the trailer and building. Whatever is left on the first trailer is just taken back.

    The borg took the place away from a local carrier. I’ve never heard that it’s technically or physically hard to do . So I’d believe anyone can do it…
     
  7. mustang190

    mustang190 Road Train Member

    2,828
    6,068
    Jan 18, 2011
    Florida Panhandle
    0
    Usually the shipper loads and driver unloads at the customer depending on the customer.
    I have done propane, really nothing to it.
     
  8. KDHCryo

    KDHCryo Medium Load Member

    396
    501
    Sep 14, 2023
    0
    That's why you hate KAG, they eliminated your job.
     
  9. KDHCryo

    KDHCryo Medium Load Member

    396
    501
    Sep 14, 2023
    0
    Just heard back from my guy that's doing it at KAG... His exact words...

    Loading is easy. Connect hoses, open valves, set the computer.
    Unload, you just connect hoses and open valves.

    What I heard from him, exact words, sounds pretty easy peezy to me.
     
  10. Cat sdp

    Cat sdp . .

    20,867
    72,119
    Apr 8, 2012
    Orion's Belt
    0
    No I wasn’t involved in that deal.

    But I do hate the Borg…..except for 7 of 9 of course
     
  11. Cali kid

    Cali kid Road Train Member

    1,731
    2,361
    Feb 15, 2011
    IE, CA
    0
    Oh yeah only 3000-4000 psi according to what the poster said. Just hook her up and let it rip!! My goodness I hope he gets some training.
     
  • Truckers Report Jobs

    Trucking Jobs in 30 seconds

    Every month 400 people find a job with the help of TruckersReport.