Another driver is telling me 1 lane is open at the bridge... Will be heading that way to find out for myself shortly.
-
Yup...
The Nipigon River Bridge in northwestern Ontario is open to one lane this morning, a day after a piece of its decking lifted more than 60 centimetres.
http://www.cbc.ca/news/canada/thunder-bay/nipigon-bridge-transcanada-update-1.3398207Dye Guardian Thanks this. -
I tell you, it is the people from Quebec, them frenchies want more land.
-
One lane is open.
-
So the Nipigon River Bridge is now open on a limited basis but supposedly bridge engineers have not yet figured out why the bridge was spontaneously dismantling itself. That is not confidence-inspiring if you are driving over the Nipigon River Bridge with a loaded Super-B. Apparently the bridge engineers are guessing that the weight limit for the wonky bridge is now about 63,500 kg's but personnel on-site may let you give it a try, at their discretion, if you are over 63,500 kg's. Watch out below!
-
-
On January 4th we crossed with 8 loads where we grossing out at 146,500 lbs.
Oddly enough, we were hauling 42 foot long concrete bridge beams for a new overpass at Vaungh, ON. Used tandem tractors, 8 wheel jeeps and tridem highboys.Pullin2, Runawayscreaming, not4hire and 1 other person Thank this. -
.......... so start leaving that stuff in Nipigon .......?Prairie Boy Thanks this.