2009 Tripac 25k Hours
Discussion in 'Ask An Owner Operator' started by mhyn, May 5, 2018.
Page 2 of 3
-
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
-
-
No. Wait. Get a Sawzall and cut in a home unit in the back. You'll need to get a generator too. Just use a bunch of roof mastic to seal the opening.
86scotty Thanks this. -
mhyn Thanks this.
-
-
-
That unit looks pretty good, definitely doesn't look like 20k hours. Keep in mind the engine hours are stored in the controller board. If that came off another unit, as-in the package was put together with components from different units, the hours may not be right.
On that one, the plastic fuel lines can be problematic so keep an eye on them, and be careful working around them. I also see it has the fuse link kit already, so the 50A maxi fuse has already been swapped out to not fail.shatteredsquare and mhyn Thank this. -
mhyn Thanks this.
-
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
Page 2 of 3