For slabs and fiber optic spools i carry and use up to 14 or so pcs of dunnage, but also need a full deck clear for a lumber job i do weekly. I built a rack under the landing gear brace from 1x1 sq tube with a 2" ratchet strap welded to the center brace under the deck. Works perfect. But needs a tight full wrap.