![]()
well I grab a steel load west. Roll into steel plant seeing coils. I hate coils on an older trailer. Especially when paperwork says 46k. (Screams 1 coil)
So I decide. Cut that bad boy in half and flatten it out. I'm done with coils.
Took them 6 hours to Make it happen. Did I mention the order was made on Wednesday. I'm here on Friday to pick up this load.
Who dropped the ball. Sounds like buyer and shipper are not talking. Typical and then tell truck it has to be their yesterday. Ugghhh
Post flatbed load photos here V2.0
Discussion in 'Flatbed Trucking Forum' started by leftlanetruckin, Feb 18, 2014.
Page 107 of 2737
-
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
-
The halves from the center would be shorter than the outer halves.
-
-
-
-
Sleepy68, peterbilt_2005, Cetane+ and 1 other person Thank this.
-
-
Cetane+ Thanks this.
-
-
That is a rooky mistake for sure.We had a new guy run from OH to IN, four hours and made it.
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
Page 107 of 2737