ill give you an example of our dedicated, We bounce between Dallas, TX and Lansing, MI, Walbridge, OH(Toledo), or Brook Park, OH(Cleveland) all drop and hook, PU in Dallas, transit time avg 45mph so equates to 25.6 hours get to destination drop trailer in one door, then pick up already loaded trailer and head back to Dallas where the process is repeated for 6 days, we usually reset at that point.
Drop in hook for both trailers takes 15-30 minutes and your back rolling.
starting US Xpress
Discussion in 'US Xpress' started by Anthony09, May 26, 2014.
Page 2 of 2
Page 2 of 2