You may as well run it continuous. I has a load going to a Domino's Pizza warehouse. It was toasty outside. It took forever to get the product down to 10 below. The reefer ran for about 8 hrs before it finally cut off. Then it cut on every 30 min if that. Its better to pick up at the places where you the shipper can open your doors from the inside. The. You don't lose much coolness if you had to precool.
Subzero temperature load
Discussion in 'Refrigerated Trucking Forum' started by poongdool, Jul 14, 2020.
Page 2 of 2
Page 2 of 2