What’s up guys. My apologies if this topic has been previously covered but I couldn’t find it . I purchased a 2013 wabash reefer trailer. Is it possible to add e tracks to it ?![]()
Adding e tracks to reefer
Discussion in 'Refrigerated Trucking Forum' started by Daddybakez, May 13, 2021.
-
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
-
Anything is posible with enough time and money.
slow.rider Thanks this. -
Any good trailer shop should be able to do it. I suggest running 2 rows, one low and one high.Jarhed1964 Thanks this.
-
That's nice looking for a 2013. Figure around 750-900 for a row installed full length both sides, nearly twice that if you want them recessed into the wall. Make sure it's done by a decent shop with reefer experience, because if it's poorly done then they can leave openings for moisture to intrude on the insulation, which will add weight and reduce cooling capacity over time.Jarhed1964 Thanks this.
-
It’s nice having the etrackJarhed1964, Speed_Drums and slow.rider Thank this. -
Did you purchase the trailer with the e tracks ?Jarhed1964 Thanks this.
-
The company I work for Orders the trailers with E track, flat floors, short shoots, and lighting inside the trailer.Jarhed1964 and slow.rider Thank this.
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.