mercer transportation
Discussion in 'Mercer' started by kw12, Jul 21, 2012.
Page 1086 of 3686
-
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
-
dont think putting a connection point in a tail light will void the warranty , man please
-
flats aint got an extra plug, ya just got to do it right when ya make the connection, get the right stuff, it it corrodes , I fix it.
-
I get what you're saying. I'm sure it won't hurt to double check to be sure. In this case it'll suck to be wrong and he voids his warranty.
-
Guess im lucky where i live a great dane dealer and truck dealers so i could always ask
-
so does mercer take care of getting the oversized/overweight permits and such? and im guessing the load details will provide the details such as if a tailing vehicle will be necessary? its not that difficult to find it out, im just curious if mercer already provides that info on the loadboard.
-
Would some one explain this warranty thing I keep hearing about.
-
My flat I got from mercer had an extra 7way plug on the front with the dump valve already wired. I just added two wires at the plug and ran them all the way back to the end of the trailer along the frame rail.
-
The lead details will say over sized and have the dimensions. If you don't know the requirements a quick call to permits and they can tell you what's needed. And yes, they take care of the permits.
stormrunner218 Thanks this. -
And then its our responsibility to find a tailing vehicle if required? I understabd the payment would come out if our settlement but does mercer assist in finding tailers?
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
Page 1086 of 3686