Finding granite haulers

Discussion in 'Flatbed Trucking Forum' started by Bsheff, Sep 27, 2016.

  1. w.h.o

    w.h.o Road Train Member

    3,583
    4,094
    Jan 10, 2011
    Chicago, il
    0
    I was gna suggest them too, since maverick does haul granite, but should the shipper provide the A frames? Maverick has A frames but it's meant for glass, but it doesn't hurt to give them a call
     
  2. Truckers Report Jobs

    Trucking Jobs in 30 seconds

    Every month 400 people find a job with the help of TruckersReport.

  3. x1Heavy

    x1Heavy Road Train Member

    34,017
    42,135
    Mar 5, 2016
    White County, Arkansas
    0
    9 Slabs a load. Maybe. If they are big as 10 by 7 high and a foot thick.

    You just caused a number of flatbed companies to salviate at the potential haul of 500 slabs. You are looking at 50 to 85 trucks. 2.40 a mile per truck. roughly.. 38,000 dollars to around god knows how much over 750 miles.
     
  4. prerunner404

    prerunner404 Medium Load Member

    452
    223
    Aug 3, 2011
    lake havasu city az
    0
    The granite slabs are not a foot thick. Depending on what material he bought weather its 2cm (3/4" thick) or 3cm (1 1/4") thick a driver should be able to haul 40-50 slabs at a time per trailer. A typical standard 2cm size granite slabs weighs around 700 lbs and that could help you figure out weight a little better. I do this particular thing for a living.
     
    x1Heavy Thanks this.
  5. x1Heavy

    x1Heavy Road Train Member

    34,017
    42,135
    Mar 5, 2016
    White County, Arkansas
    0
    Much appreciated. I was off on my figures.

    Ive hauled stone once or twice, just did not make a habit of it which shows in my inexperience with it.
     
    prerunner404 Thanks this.
  6. passingthru69

    passingthru69 Road Train Member

    Heck even if I had to build racks to get the job I would for that many lds.
    But I run a lowboy.
     
    Ruthless Thanks this.
  7. Ruthless

    Ruthless Road Train Member

    8,931
    87,834
    Aug 28, 2010
    The City.
    0
    More axles= more slabs per load. Drape a rag over it n say it's nondivisible chunk rock
     
  8. passingthru69

    passingthru69 Road Train Member

    Who needs more axles. Just ld her up and go...
     
    Ruthless and johndeere4020 Thank this.
  9. snowwy

    snowwy Road Train Member

    20,537
    13,274
    Jul 6, 2009
    0
    My last company had some frames in the yard. Once in awhile he'd send us out with steel or rebar. The usual haul out. We'd load the frames on top and bring back glass or slabs of some type. If that's what we were bring back.


    Just an idea to consider in looking for a truck
     
  10. dlstruck

    dlstruck Medium Load Member

    481
    390
    Sep 8, 2016
    0
    If you have a time limit of when you need to get those moved, you'll probably need to pay a trucking company round trip rates to run back and forth and do them fast. It will probably be cheapest to build the frame yourself out of wood.

    Or you can find a broker to post it up and have 10 different trucks do the loads. It MIGHT be cheaper that way since you won't have to pay round trip rates.
     
  11. Ruthless

    Ruthless Road Train Member

    8,931
    87,834
    Aug 28, 2010
    The City.
    0
    Healthy MIGHT on that one!
     
  • Truckers Report Jobs

    Trucking Jobs in 30 seconds

    Every month 400 people find a job with the help of TruckersReport.