800,000 kg superload!!!

Discussion in 'Heavy Haul Trucking Forum' started by AModelCat, Jan 7, 2019.

  1. not4hire

    not4hire Road Train Member

    7,142
    26,957
    May 16, 2012
    Calgary
    0
    And for those of you whose calculator batteries are dead:
    • 820,000 kg (~1,800,000 lbs)
    • 179 m (587 ft) overall length
    • 9.5 m (31 ft) wide
    • 13 m (43 ft) high
    The good news is that Alberta is superload central, so a lot of the infrastructure is designed to make it a lot easier.
     
  2. Truckers Report Jobs

    Trucking Jobs in 30 seconds

    Every month 400 people find a job with the help of TruckersReport.

  3. Humblepie

    Humblepie Pontificator

    5,077
    80,318
    Dec 25, 2018
    0
    Don’t know why anyone cares what he thinks.
     
  4. uncleal13

    uncleal13 Road Train Member

    3,797
    6,299
    Apr 9, 2009
    Humboldt, Sk
    0
    I talked to a guy that did a move like that from Calgary to Fort McMurray and return empty. He said he was on the road for seven months total for the one job.
    I believed him once I watched them leave the Hanna truck stop. Took about twenty minutes just to get the rig out onto the highway.
     
  5. not4hire

    not4hire Road Train Member

    7,142
    26,957
    May 16, 2012
    Calgary
    0
    How big is it? Well, just for giggles, this is the largest private yacht in the world. It is 1 m longer.

    Azzam

    [​IMG]
     
  6. sdaniel

    sdaniel Road Train Member

    5,511
    4,420
    Sep 7, 2011
    Pelham N.C.
    0
    Saw that he post a video with one 1/3 that size . Priceless!
     
    jamespmack, magoo68, Cat sdp and 2 others Thank this.
  7. shakerclassic

    shakerclassic Bobtail Member

    37
    44
    Jun 10, 2018
    0
    Holy hell! That thing is gonna be crazy going down the road!! I wonder how much that move is gonna cost total and what the profit on something like this is? I mean you have to have very expensive and specialized equipment or you can't even think of attempting to do it so the market is fairly small in terms of competition but then again your not gonna move one of these every week.. Very fascinating to say the least. I'd love to be on the side of the road just watching it roll by..
     
    jamespmack and PoleCrusher Thank this.
  8. AModelCat

    AModelCat Road Train Member

    29,464
    162,198
    Jul 7, 2015
    Canuckistan
    0
    If I see it on the move I'll snap some photos for ya'll!
     
  9. Tb0n3

    Tb0n3 Road Train Member

    4,710
    9,546
    Oct 5, 2012
    Earth
    0
    I've always kind of wondered why they don't go beyond kilo for these large numbers. You'll use mega for megawatts, but not megagrams? 800Mg.
     
    jamespmack and homeskillet Thank this.
  10. magoo68

    magoo68 Road Train Member

    3,393
    5,385
    Jun 11, 2011
    st malo mb canada
    0
    Not often you see a 4 story building a football field in length roll by .. I’ll say this it take a big set to walk beside or sit beside that load going down the road
     
    PoleCrusher Thanks this.
  11. x1Heavy

    x1Heavy Road Train Member

    34,016
    42,139
    Mar 5, 2016
    White County, Arkansas
    0
    Peach Bottom in PA near the border above Baltimore, nuclear plant received a heavy transformer assembly. Took a couple years to build in Korea, some months to ship on the water and almost a year in planning and execution of delivery of that heavy lift to the plant grounds over mostly two lane roads in rolling terrain.

    I understand they used dump trucks to drop gravel etc to build up soft spots in the existing roadway in many places to get it across.

    I don't know what those cost overall to get it in there, but it better last a good long time, if it went out again and need replacing, it will be years before anyone there has electricity.
     
    shakerclassic Thanks this.
  • Truckers Report Jobs

    Trucking Jobs in 30 seconds

    Every month 400 people find a job with the help of TruckersReport.