crane building the new bridge toppled over , landing on tbe old one blocking all lanes both ways.
would expect it will be a while to break the crame down after investigation and inspect the old for damage before its reopened.
Tappan Zee
Discussion in 'Schneider' started by mickeyrat, Jul 19, 2016.
Page 1 of 2
-
rabbiporkchop, AM14, 91B20H8 and 2 others Thank this.
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
-
Where's that at?
-
I 287 NY. connects Westchester and Rockland counties. its a way of crossing the hudson that isnt nearly as slow and frustrating as the GWB.
http://mobile.nytimes.com/2016/07/2...idge.html?_r=0&referer=https://duckduckgo.comborn&raisedintheusa, Mark Kling and audeygdad Thank this. -
Can you IMAGINE what the traffic will be like on the GW bridge @ 1700?
rabbiporkchop and bzinger Thank this. -
Oh holy crap thank god I'm nowhere near there. 95s in CT will be hell forever
KillingTime Thanks this. -
West bound open..
East bound closed....
Roll on.... -
You'll get a message on your Qualcomm in about 4 days letting you know it's closed lol.
milehunter43, Thull, PoleCrusher and 5 others Thank this. -
TennMan Thanks this.
-
I could have shot myself for lack of anything else going on.Hick Thanks this. -
It is pretty crazy that nobody got killed by this. Considering the amount of constant traffic on that bridge, day and night. On a somewhat related but useless information note, that bright blue crane working the new bridge is one of the largest floating cranes in the world. That's probably the only tidbit of information I've heard on the cb that actually turned out to be true.
alpha beta and 91B20H8 Thank this.
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
Page 1 of 2