Start this off on the laptop, so I can patch myself on with the phone to attach photos.
2015 Doonan Stretch Step Extendable, needs decking replaced - photos and jerry rigged schematics on board length and width etc to follow.
Called TNT and they're about to get back to me with a quote, after some advice on 'DIY' or 'Send it off and pick it up'.
Replacing decking on 015 Doonan Stretch Step Extendable
Discussion in 'Flatbed Trucking Forum' started by blairandgretchen, Jun 27, 2025.
Page 1 of 7
-
OLDSKOOLERnWV, Oxbow, ElmerFudpucker and 4 others Thank this.
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
-
cke, FullMetalJacket, tramm01 and 2 others Thank this.
-
About 300' of 7" wide and 180' of 5" wide apitong, shiplap.
Hack off the old, cut off wheel and grind, then repaint crossmembers, and replace cut to fit , new deck.
Is it worth trying to do it myself, or better off to send it to a place that does it all day long?
They ESTIMATED 40-50 hrs labor @ $115/hr for the job.Rideandrepair, cke, FullMetalJacket and 3 others Thank this. -
If that quote includes the apitong it's worth it IMO. That's a back breaking and time consuming job. Now's the time to do it while things are slow though. I'd try to lock them into an all in flat price of 4k if I were you.
Rideandrepair, cke and Walk Among Us Thank this. -
OLDSKOOLERnWV, Rideandrepair, Oxbow and 5 others Thank this.
-
I've replaced a bunch of floors. Not a big deal IMO. Don't worrk about the old screws, just remove the wood as fast as possible. Take a cut off wheek to the screws left behind.
Buy a handfull of good drill bits, cut new floor, use a chalk line and drill all new holes. I'd say that's a 20 hour job if you don't eff around.OLDSKOOLERnWV, Ok big boy, Rideandrepair and 10 others Thank this. -
Rideandrepair, Oxbow, cke and 2 others Thank this.
-
I don’t think 50 hours is outta line. Day to strip. Day to prep. Day the cut and fit boards. Probably 2 days to screw it down.
The big time saver is marking where the old screws are in the crossmembers. You toast a new bit in 2 seconds when you hit an old screw. Some steel drills much easier than others.
My knees hurt just looking at it. Maybe a tad easier than roofing.Rideandrepair, Oxbow, cke and 3 others Thank this. -
Re - deck 3 or 4 sheets, flashing, rolled roofing underlay on the shallow pitch that was causing problems.
Local roofer/friend. $15k. Day and a half in between weather - 3 guy crew.
And if there’s ever a problem - he, or his son will be here within a day to guarantee it.
I got up there and helped tear off, and spread shingles ahead of the nailer. Learned a lot.
Like - “You can say you can do it cheaper/faster/better”. -
Till you actually put your muscles where your mouth was.OLDSKOOLERnWV, Rideandrepair, lual and 8 others Thank this. -
His ballpark was 45-55 hours labor exclusive of materials.Rideandrepair, Carpenter Scotty, cke and 3 others Thank this.
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
Page 1 of 7