The one that crosses Markland Dam. The one in Madison has been dropped to 3 tons. It was old and worn out when I was a kid. They're building a new one in the bottoms that when done, they're going to float it up river then lift it up on new piers.
Heading For Little Rock! Maverick
Discussion in 'Maverick' started by JimTheHut, Feb 2, 2010.
Page 264 of 565
-
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
-
gotta love her, lol! -
How is the new gig working out? -
Does anyone else ever have a problem with their qualcomm turning on when you start your day? Mine has done it a couple times to me... start the truck, building air pressure, do my pre trip, get in the truck ready to roll, and the darn thing wont turn on... so I get my paper log out, fill it out, hit the road, and twenty minutes down the road it finally turns on... is there any way to manually turn it on?
-
-
No, mines the newer of the qualcomms... its like after it goes to sleep, it will only come back on when its scheduled to?
-
Im still goin with a short in the connection
-
The main box in mind when bad a few weeks ago. All I can say is have the shop check it out. In electronics I'm not too bright all I know is three lights need to be working on the main box mind only had 2.
-
Hmm, I assume the main box is the one under the bunk? mine doesn't have any lights on it lol
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
Page 264 of 565