Abilene Motor Express....A New Place To Call Home

Discussion in 'Discuss Your Favorite Trucking Company Here' started by JohnBoy, Apr 10, 2013.

  1. 460/580

    460/580 Light Load Member

    249
    624
    May 13, 2016
    Virginia
    0
    My rm picks a dif way round dc each time so it seems. The express lanes on the beltway are good going over bridge. The ez pass lanes on way to dc and on western side are not i think.

    Express ezpass near 695 n of baltimore are good too
     
    Redtwin Thanks this.
  2. Truckers Report Jobs

    Trucking Jobs in 30 seconds

    Every month 400 people find a job with the help of TruckersReport.

  3. bigred81

    bigred81 Medium Load Member

    648
    425
    Aug 5, 2013
    0
    I'm pretty sure the VA express lanes between Springfield and Dulles Toll Road are non truck lanes I'm pretty sure. I think I saw a guy getting written up just this week.
     
    MACK E-6 Thanks this.
  4. Barn Door Bill

    Barn Door Bill Medium Load Member

    349
    647
    Oct 6, 2015
    0
    So, my name came up for the Hunger Games: I'm going to Brooklyn. But this time I thought about maybe taking 440 out of Jersey and skipping the Goethals. Anyone know if I can? It's not highlighted as a STAA in the mapbook but that doesn't always mean it can't be taken.
     
  5. JohnBoy

    JohnBoy Road Train Member

    10,002
    26,943
    Apr 24, 2009
    Lake Worth, FL.
    0
    Yes you can. It turns into the Staten Island Expressway as soon as you cross over from Jersey.
     
    Barn Door Bill Thanks this.
  6. MACK E-6

    MACK E-6 Moderator Staff Member

    48,939
    226,947
    Sep 19, 2005
    Baltimore, MD
    0
    Those are, but the ones crossing the WW are okay for trucks.
     
    JohnBoy Thanks this.
  7. MACK E-6

    MACK E-6 Moderator Staff Member

    48,939
    226,947
    Sep 19, 2005
    Baltimore, MD
    0
    The Outerbridge isn't really any better than the Goethals bridge though. It has the same narrow lanes.
     
    JohnBoy Thanks this.
  8. Barn Door Bill

    Barn Door Bill Medium Load Member

    349
    647
    Oct 6, 2015
    0
    Yeah. But all that merging crap through the tollbox to get onto the bridge is the heartburn I'd like to avoid. Now hopefully I'll get there early enough that the bullpen might have a spot.
     
    MidWest_MacDaddy, JohnBoy and MACK E-6 Thank this.
  9. Redtwin

    Redtwin Road Train Member

    5,487
    7,608
    Aug 17, 2012
    PBC, FL
    0
    Speaking of getting a parking spot, if someone had told me that a 75 space Flying J would be full at 8am on a Sunday I wouldn't have believed them.

    Not only are all the regular spots full, all the reserved spots are full and there are trucks parked everywhere. Even the car parking area has bobtails double parked.

    Add in all the beggars and bums roaming the place and the J in SLC is now in my top 3 worst truck stops.:mad:
     
  10. 460/580

    460/580 Light Load Member

    249
    624
    May 13, 2016
    Virginia
    0
    The new goethals span is open and has actual full size lanes and even shoulders. Right now 2 each direction but sounds like 3 or 4 is the ultimate plan once 2nd span is done.

    Same with bridge at 278 and 495.

    Shocking to say but they are generally well done and traffic is flowing better at both now.
     
  11. Barn Door Bill

    Barn Door Bill Medium Load Member

    349
    647
    Oct 6, 2015
    0
    I'd agree were it not for the sewer dwellers crossing it with me. I take it from the lack of security guards and padlocks everywhere that I'm going to have a wait before anyone arrives to open the bullpen?
     
  • Truckers Report Jobs

    Trucking Jobs in 30 seconds

    Every month 400 people find a job with the help of TruckersReport.