A local tow company posted a picture of a tow truck he is having built in Chattanooga. It's a 75 ton, twin steer, Peterbilt. That's going to be a nice wrecker but according to the owner, it will take approximately 1 year to build it.
It's certainly going to be something different in SouthEast Alabama.
Has anyone ever driven a truck with twin steer axles?
Discussion in 'Questions From New Drivers' started by FlaSwampRat, Jul 14, 2019.
Page 2 of 4
-
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
-
If he is building a 75 ton it is most likely a Miller Industries Century unit, nice truck. As far as I know Miller is about 90-120 days on build and mount time. I represent Jerr-Dan and we too are almost a year for a custom truck right now.
It has been a good year to be in the equipment sales business. Too bad this is only part of my work, my speaking and consulting is my full time endeavor.Lepton1, FlaSwampRat, Intothesunset and 1 other person Thank this. -
FlaSwampRat, Intothesunset and Hammer166 Thank this.
-
brian991219, FlaSwampRat and Intothesunset Thank this.
-
Got to drive this the other day. 45 ton mobile crane.
-
Doesn't Oshkosh build heavy wrecker drivetrains?
FlaSwampRat Thanks this. -
This is our typical rotator configuration, 5 axles. Comes in right about 15k on each axle, nice and balanced. Note, the sleeper is not typical of our rotators, this was a custom truck -but the axle spacing and weight is typical of the Jerr-Dan units.
-
Feedman, Intothesunset and FlaSwampRat Thank this.
-
I just pictured driving it would be similar to driving this. It was kinda scary because the guy driving it seemed like he really didn't know what he was doing. When he was setting the truck down he asked if I had wheel chocks because it felt like it was going to roll so I went and got a few. As he was setting it down I jumped in and set the brake lol...ya think he might of looked at that? Then he was walking around unhooking it and tripped over the wheel lift and banged his shin up pretty good. I'm hoping he was just having a bad day but with the tow drivers around here it seems pretty normal. They don't pay those guys enough.
-
8 axle twin steer truck & pull dolly trailer. Chip wagon. 26k on the front steers. U & R Express White city, Or. 1985. 102" cab by Freightliner. 444 Cummings & 15 speed. Fondly know as useless and reckless.
FlaSwampRat Thanks this.
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
Page 2 of 4