Cummins M11 Inframe rebuild Progressive updates

Discussion in 'Trucks [ Eighteen Wheelers ]' started by AUSSIE DAVE, May 29, 2010.

  1. AUSSIE DAVE

    AUSSIE DAVE Road Train Member

    1,032
    176
    Feb 21, 2010
    OZ - Brisbane
    0
    Hi all, a few of you asked me to keep u updated, so this thread is for that purpose, hopefully I can do a good job of keeping you all updated. and it will be a source of infomation in the future, I intend to add photo's as well or at the very least post links to photo's. I purchased the Inframe Kit today and therefore have officially started on the assembly / reconstruction of my M11. I have only had time to check the piston ring end gaps so far, please find a link to a photo. (i hope) :biggrin_2559: The photo is of the cylinder sleeve with the piston sitting at the bottom (actually the top) of it, and the black colored ring which is the intermeadiate ring being measured with feeler gauges.

    http://i1030.photobucket.com/albums/y362/dcarvolth/T401%20Inframe/CheckingRingEndGaponM11CylinderSlee.jpg

    P.S
    This is my Kenworth T401 that I am doing the Inframe on, as well as other work, getting her ready to start subcontracting some time this year. it is bogee drive, 18 speed road ranger box, Cummins M11 rated at 400HP, and you can see the other features in the pic.

    [​IMG]">
     
    Last edited: May 29, 2010
    blanco Thanks this.
  2. Truckers Report Jobs

    Trucking Jobs in 30 seconds

    Every month 400 people find a job with the help of TruckersReport.

  3. AUSSIE DAVE

    AUSSIE DAVE Road Train Member

    1,032
    176
    Feb 21, 2010
    OZ - Brisbane
    0
    UPDATE
    Well I have managed to do some more prep work today, Cleaned the gasket surfaces of the Jake Housing, the Tappet Housing ready for re-assembly. I Also Removed Pistons from Conrods and Cleaned the Conrods ready to fit the new pistons. I then moved on to giving my Work area a clean to remove dust, etc to provide a cleaner environment for the rebuild work. Photo's to follow once I get them sorted.
     
  4. latitude500

    latitude500 Bobtail Member

    22
    2
    Mar 28, 2011
    0
    Do you have anymore updates on the inframe project. Would love to read more.
     
  5. Pablo-UA

    Pablo-UA Road Train Member

    7,604
    1,642
    Oct 11, 2010
    Borispol, Ukraine
    0
    I like M11... really easy to fix engine. sometimes it seems to me it is better N14
     
  6. earthmover

    earthmover Medium Load Member

    563
    20
    Jan 27, 2009
    castalia , north carolina
    0
    whats the cost of the inframe kitif you dont mind????
     
  7. AUSSIE DAVE

    AUSSIE DAVE Road Train Member

    1,032
    176
    Feb 21, 2010
    OZ - Brisbane
    0
    i purchased a PAI brand after much research on quality/price, the cummins was $5000au and the PAI $2750au. other were more and some were cheaper, but PAI are excellent quality at a reasonable price.
     
  8. AUSSIE DAVE

    AUSSIE DAVE Road Train Member

    1,032
    176
    Feb 21, 2010
    OZ - Brisbane
    0
    the follow job was to assemble the pistons to the conrods, easy job I use lucas oil treatment to lube the conrod piston, and then set them aside wraped in clean rags.

    after cleaning the engine block internally with a combination of compressed air and brass brush and diesel, I moved on to installing the new piston sleeves into the engine, I placed all six sleeves into my freezer over night to help contract them slightly so they would go in easier.

    then the next morning took one at a time out of the freezer installed the rubber seal and gave the seal and the area wear the seal slides on a very heavy coating of sunlight dishwashing liquid to help them slide into position without causing damage.

    I used a home made tool to install them into the engine (old steel flange with 3 bolts welded into it that fits inside the sleeves and put insulation tape around each bolt so they did not scratch the sleeves) I Used a 3lb hammer to drive them into postion and then checked for correct protrusion
     
  9. AUSSIE DAVE

    AUSSIE DAVE Road Train Member

    1,032
    176
    Feb 21, 2010
    OZ - Brisbane
    0
    yep easy to work on, the hardest part was removing old pistons, the engine sat for 18 months with water in the bores, I had to remove pistons with a steel rod and a 6lb sledge hammer and it took me three days lying on my back, it was very hard on my arms and shoulders (getting old LOL)
     
  • Truckers Report Jobs

    Trucking Jobs in 30 seconds

    Every month 400 people find a job with the help of TruckersReport.