Would you hook from the outside over the edge of the trailer onto the inside of the track?
Big Loads - Post Photos Number 2
Discussion in 'Heavy Haul Trucking Forum' started by truckdad, Aug 3, 2015.
Page 226 of 932
-
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
-
I hook from the inside of the track to rail of the trailer and from the outside of the track to the inside of the beam in the center of my trailer. I also hook from the square cut out in the side frame down to
Either a d ring or the webbing. And the I use a shackle on the center eye front and back and go to the webbing or d rings inside the beams on my trailer.Dye Guardian Thanks this. -
Here's how I do it on medium sized excavators I had a better picture but I can't find it.
TripleSix and Dye Guardian Thank this. -
Looks
Like a dozer to me JD ? -
-
-
Dye Guardian Thanks this.
-
When I haul the pipe layers I also chain around the weight rack then down to a d-ring. This serves two purposes. It holds the weight rack from leaking out and it adds an extra tiedown point.
-
Must be on a long haul. 3 pipelayers today 4 chains.. Job superintendent was like why so long.. need to get moving..
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
Page 226 of 932