I-255 Closure In Illinois-10 Month Project
Discussion in 'Truckers' Weather & Road Conditions' started by mjd4277, Jan 30, 2020.
-
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
-
If you can close down an entire interstate for a year do you really need to even waste money fixing it?
Besides, if anyone actually keeps track, they'll likely only spend about 1/5th of that time actually having work done on it. Just like any other road work zone in Illinois.bzinger and Cabinover101 Thank this. -
Some of our roads were being replaced for 15 years. I-57 will be done in 4. Just need them to hurry up and replace the 1962 pavement of concrete plates tearing our vehicles up. They are getting there but slowly.
Cabinover101 Thanks this. -
bzinger Thanks this.
-
They did something like that when they did the big road through Bloomington, nice when they got it done, though.
mjd4277 Thanks this.
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.