Post flatbed load photos here V2.0

Discussion in 'Flatbed Trucking Forum' started by leftlanetruckin, Feb 18, 2014.

  1. skellr

    skellr Road Train Member

    Joined:
    Jul 17, 2011
    Messages:
    8,737
    Thanks Received:
    12,185
    Location:
    The Village, Portmeirion
    0
    Quite a few shipping offices have a photo of some guy with a busted up face as a warning about thoes. It seems like only the big outfits can afford to ban thier use.

    It wouldn't be the same without them.
     
    Rugerfan Thanks this.
  2. Rugerfan

    Rugerfan Road Train Member

    Joined:
    May 3, 2011
    Messages:
    7,361
    Thanks Received:
    36,355
    Location:
    Redding,CA
    0
    The place I worked for doesn't like ratchet binders because someone that's new and not paying attention could over tighten them.
     
  3. MJ1657

    MJ1657 Road Train Member

    Joined:
    Jan 28, 2012
    Messages:
    7,521
    Thanks Received:
    50,151
    Location:
    Isanti, MN
    0
    My load for western MN. Called the receiver and he said the weather was so nasty to not bring it until at least Wednesday. Oh well IMG_20151130_110514874.jpg
     
    KenworthGuyNH, Sleepy68, 7-UP and 2 others Thank this.
  4. Ozdriver

    Ozdriver Heavy Load Member

    Joined:
    Oct 16, 2015
    Messages:
    767
    Thanks Received:
    1,390
    Location:
    Australia
    0
    The hub seals for oil are different to grease hubs so they would have changed them over. I like oil hubs better because when you do a brake job it is a lot cleaner to do without grease everywhere. Only problem with oil hubs is you'll get a leak if the bearing adjustment goes loose.
     
    Ruthless Thanks this.
  5. Chewy352

    Chewy352 Road Train Member

    Joined:
    Dec 17, 2013
    Messages:
    1,797
    Thanks Received:
    11,619
    Location:
    Enid, OK
    0
    I had a bearing come loose on me with grease hubs and this is how I found out. I much rather have oil hubs. 20150527_114300.jpg
     
    Ozdriver, MJ1657 and Rugerfan Thank this.
  6. cnsper

    cnsper Road Train Member

    Joined:
    Feb 28, 2014
    Messages:
    5,869
    Thanks Received:
    27,421
    0
    Loaded this today for delivery tomorrow. 19 sticks of 18" pipe, 25 pieces of 12" pipe and a mold for 60" pipe.
    [​IMG]
    When you haul different sized pipe you have to make sure that the cable you run from front to back actually touches all the pipe. Hence the chain across the cable to pull it down.
    [​IMG]
     
    TripleSix, Ozdriver, Pipe 40 and 3 others Thank this.
  7. Chewy352

    Chewy352 Road Train Member

    Joined:
    Dec 17, 2013
    Messages:
    1,797
    Thanks Received:
    11,619
    Location:
    Enid, OK
    0
    How would you or could you haul that load without the cables?
     
  8. cnsper

    cnsper Road Train Member

    Joined:
    Feb 28, 2014
    Messages:
    5,869
    Thanks Received:
    27,421
    0
    You could use chain but all of our trailers have 2 cables either in the boxes or on the decks. Most of the time they are on the decks running along the rub rails.
     
    Chewy352 Thanks this.
  9. Chewy352

    Chewy352 Road Train Member

    Joined:
    Dec 17, 2013
    Messages:
    1,797
    Thanks Received:
    11,619
    Location:
    Enid, OK
    0
    I don't think I have enough chains then. Probably take 6 chains total on top then 2 chains on the front and 2 on the back. If they were all the same size that is. Well maybe I have enough. I have 11 chains.
     
  10. cnsper

    cnsper Road Train Member

    Joined:
    Feb 28, 2014
    Messages:
    5,869
    Thanks Received:
    27,421
    0
    You also need a chain in the middle. You still need one every 10 feet. The way I do it is one in the bottom end pipe(front and back), one in the top end pipe and then one through the top pipe every 10 feet and then the cables over the top.

    You do it this way you will always be good on your WLL. You need to have the appropriate WLL for each group of pipe.

    For instance, on the 12 inch pipe the total load weight is 30k. I have 5 each 5/16" chains on that group of pipe and 2 each 3/8" cables for a total WLL of 29,500 pounds.
     
    Pipe 40 Thanks this.