Any load that "rolls on" and takes 15 min to secure and go is a easy load i think, but the rates need to justify the cost/expense of making sure to get it there not damaged.
A Cpape said, hopefully the slow season will get some of the cheap for-hire guys out of his gravy.
Post your flatbed load pictures here
Discussion in 'Flatbed Trucking Forum' started by the gambler, Dec 8, 2011.
- Thread Status:
- Not open for further replies.
Page 288 of 785
-
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
-
My gravy comes when there is 15' left open on a trailer.
-
aiwiron Thanks this.
-
-
That is why I refuse to give price lists on a list of routes given to me by big freight forwarders.
I need to know value and be able to assign level of risk.
A dozer of the same size and dimension is a lot cheaper and less prone to damage than a mobile single phase transformer rectifier.
There is no way they are going to be priced nearly the same. -
-
-
cpape this is chuck ,I called you the other day about my boy ,he faxed an application into you guys,his name was Fred
-
Good. I was hoping you would do that. I will be sure to look for it.
-
He is young but has hauled heavy (7 axles now) wide and high on the wheat harvest, thanks
SHC Thanks this.
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
Page 288 of 785
- Thread Status:
- Not open for further replies.