Just got told that we bought the old SWIFT Terminal at SLC. They said they are going to start ground breaking in Jan 2014. They said we should move into new terminal by summer 2014. it will be of the I-215
SLC Terminal
Discussion in 'Prime' started by jdsouza, Dec 3, 2013.
-
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
-
Interesting....
-
has to be better then what they got in scl now. can't stand going to the slc terminal.
-
-
not sure but the staff at SLC there is 2 options. 1st one is to tear all buildings down start from ground 0. 2nd option is to upgrade buildings build bunk rooms cafeteria and trailer shop
-
Option 3... nuke it, and start over!
-
I agree hope the layout will be better than Pittston. was told its a 32 acre
-
Pretty obvious we've outgrown the old CH Dredge location.
-
I heard the same. SLC is a pit.
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.