I did 550 once with a 53’ Durango to Montrose. Very bad decision but at least it was summer and a very light load.
Colorado Hwy 550 Durango north with a 53' step deck?
Discussion in 'Questions From New Drivers' started by Rukamfg, Apr 1, 2024.
Page 2 of 3
-
SoulScream84, Dave_in_AZ, Big Road Skateboard and 2 others Thank this.
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
-
I think it says the grades are 9%. My truck runs strong, and I dropped into the low side pulling up
Magoo1968, SoulScream84, Dave_in_AZ and 5 others Thank this. -
This is the sign posted heading south on Us50 - August last year. I was running Telluride from Grand Junction at that time.
So, if the state feels a need to post that, it might be a good indicator.
But hey - sometimes it’ll be the most alive you’ve felt in a while.
Magoo1968, SoulScream84, Bud A. and 5 others Thank this. -
SoulScream84, Big Road Skateboard and 86scotty Thank this.
-
SoulScream84, Bud A., PacoTaco and 2 others Thank this.
-
SoulScream84 and Big Road Skateboard Thank this.
-
SoulScream84, Big Road Skateboard and blairandgretchen Thank this.
-
Dahmed traffic lamb
SoulScream84 Thanks this. -
SoulScream84, Bud A., PacoTaco and 1 other person Thank this.
-
SoulScream84, TX2Day and Big Road Skateboard Thank this.
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
Page 2 of 3