So, back over at Bama at the time I was told to come back. They still don't have product. Found from the yard driver that there were having production issues yesterday and have 60,000lbs (yes 60 thousand pounds) of unusable unfinished product. And now, everything is all backed upped.
Running with JCT, Part Deux
Discussion in 'John Christner' started by drloveofdfw, Feb 13, 2014.
Page 1085 of 1901
-
-
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
-
Why rent them? so weird
-
-
MachoCyclone Thanks this.
-
Still at Bama waiting to be loaded. They have 4 trucks waiting to be loaded. I'm the first one on the list to be loaded. So, hopefully there is enough product that passes QC to get me loaded.
Then I still have to take the trailer to the black hole (yard) so the shop can put the logo on it. But, the shop is closing at 6pm tonight, so, it will have to wait til tomorrow morning. -
My qualcomm is stuck on pacific standard time. Hopefully it will self correct. I went into the Settings and made sure it is set for CST but the unit is still displaing PST.
-
Drop, hook, reefer is bleeding oil....
And so my streak of getting ####ed up trailers begins again...MachoCyclone Thanks this. -
Cheyenne (fuel up) to Temple, Hillsboro, then Seguin TX. 78,000 lbs 65 mph. -
Wish i could get that my fuel milage has plummeted the last week and a half. think i may have had a bad luck run of hitting up the stops that have already switched to winter blends
-
Ugh this reefer is on start stop but wont start stop. Its just Forest Gumping (Runnnnnninnnnnn). 26 degree cycle and its 45 outside. #### thing should be off.
Probably doesent help that the trailer is only 1/4 full. (11K lbs)
Trucking Jobs in 30 seconds
Every month 400 people find a job with the help of TruckersReport.
Page 1085 of 1901